10/14/2011 01:13 PM
8-26-09
Temporary mock up of the seating arrangement.
Note the 4" over hang of the drawer and face.
This is where the finished face will be when completed.
  
Note the amount of seating space available .
   
I had Tony sit in as a stand in . He is about 160lbs 5'10" tall
Note the room he has ..
  
This is showing where the unit would come in as it is with this present over
hang .
Also , Tony is pointing to where it would be if we add another 4-6" to it ..
It starts with 32" but with our over hang we added about 4" to it as it is now.
We can always add more if we have enough room inside.
   
If we install cabinets above the light valance . they won't be
very tall with only 6" in space .
   
The outside rough opening ..with braces and trim installed

8-21-09
  
8-19-09
   
8-18-09
  
8-17-09
  
  
  
8-12-09
  
 
8-11-09
Slide Out Floor deck sized and fitted,
Also we are building the new cabin ..
   
 
Wiring caught up as we go
 
8-10-09
 
Last months prebuilt cabin
  
8-7-09
   

8-6-09
Slideout components came in.
Now we are ready to install the Slideout system ..
 
8-3-09
  
 
  
  
7-29-09
   
7-28-09
   
7-22-09
   
 
  
 
 
7-21-09
   
   
  
 
7-20-09
   
  
  
7-15-09
   
   
   
7-14-09
   
Interior with cabinets to be moved out
   
   
   
 
 
   
   

7-13-09
Pulled into production area
 |