3-24-09
Aluminum installed on the door, and preparing to install the door below drivers
side window

Slide-out flooring completed trim installed around the slide-out

Working on installing
the floor in the entrance way

3-17-09
Finishing up the slide-out flooring

Carpeting installed in the bedroom cabinet

Vent being installed in the bathroom

Switches install above drivers area

3-10-09
Installing the rain
gutters


Preparing to install the co-pilot seat

Filling in the holes on top of the roof where antennas went

3-6-09
Installed the battery door

Installed the door
lock latch

Awning work being done

Finishing up the slide-out , Putting the cover over the motor

3-4-09
Molding put on in the bathroom

Fantastic vent case installed

Drawer pulls installed in the bathroom

More molding installed in walk way

The rest of the light boxes installed

Installing a electrical outlet under the kitchen cabinets

The molds of the head lights finished
 |