12-29-08
Installing electrical outlets


Mirror glass in the kitchen area

12-23-08
Installing the water lines for the hot and cold water for the shower

12-18-08
Running the water lines

12-17-08
Cook tops hooked up and working

More of the hardwood flooring

Showing how the wiring is getting run for the awning

More hardwood flooring pictures

12-16-08
Installing the hardwood flooring


Showing the awning is installed and out a little bit
12-15-08
Installing the hot water heater

Showing how far apart the luggage bay door and awning rail is
12-12-08
Installing the awning
12-10-08
Preparing to install the awning

12-9-08
Running More wire for the slide out

Lights hooked up to the inside of the slide-out

Making hoes and running more wires
12-5-08
Wiring up the awning
Prepping the awning box wiring

Ceiling lights getting hooked up